Integrated maintenance services

 

The Integrated Maintenance Services for Buildings and Infrastructures approach allows including all the services necessary for the correct operation and conservation of both building and infrastructures in one sole contract and having VOLCONSA as the sole interlocutor, which in turn allows the ownership to keep control on their assets and focus on their own activity.
 

Integrated maintenance services encompass all the maintenance activities required for facilities and buildings, such as:
 

  • Designing and monitoring the preventative maintenance plans established according to the technical specifications of each installation, system, or piece of equipment.

  • Implementing the actual corrective maintenance actions.

  • Complying with the maintenance schedule and maintaining the continuity of layouts and networks routing required for the correct operation of installations, facilities and infrastructures.

  • Carrying out corrective and predictive maintenance tasks to keep the facilities operating at their most efficient level of performance.

  • Managing energy and environmental parameters to ensure efficient energy use and optimize the consumption costs generated by the facility.

  • Managing the Technical and Legal aspects associated to the operation of the facility.
     

VOLCONSA provides maintenance services at different types of facilities:
 

  • Air conditioning

  • Electricity (LV; HV)

  • Security

  • Plumbing and HSW

  • Communications

  • Fire Protection

  • Elevators

  • Masonry, painting, locksmithing

  • Carpentry, etc



     
NEWS
prev next
Wednesday, 07 September 2011

The Ministry of Industry, Tourism and Trade has awarded to Volconsa the works for the improvement of the conditions of fire-prevention security in different common plants on grazing from the Ministerial Complex of Cuzco, headquarters of the Ministry of Industry, Tourism and Trade and the Ministry of Economy and Treasury.


Monday, 18 July 2011

ONAS has awarded to UTE Volconsa/Lopesan/Geaur the works of waste water cleaning in districts of the city of Mbour, in Senegal. The implementation time will be 24 months and a budget of 7.638.225,57 €.