Volconsa will realize the cleaning and station of treatment in villa of Mbour in Senegal

Jul 18


7/18/2011  RssIcon

ONAS has awarded to UTE Volconsa/Lopesan/Geaur the works of waste water cleaning in districts of the city of Mbour, in Senegal. The implementation time will be 24 months and a budget of 7.638.225,57 €.

The predicted works include:

• The construction of collective networks of cleaning including the pumping stations.
• The construction of a station of purification by “lagunage” of waste waters and connected civil engineer installations.
• The construction of a station of treatment of drainage muds that must be integrated in the stations of purification by “lagunage”.
• The construction of aediculums public in the scholastic centers, of health and policemen (markets, stations…).
• The construction of individual works of connection to the collective network.
• The construction of individual works of independent cleaning.

Étiquettes:
Categories:
Localisation: Blogs Parent Separator Volconsa (US)
NOUVELLES
prev next
mercredi, 07 septembre 2011

Le Ministère d'Industrie, Tourisme et Commerce a attribué à Volconsa les oeuvres pour l'amélioration des conditions de sécurité contre des incendies dans différentes plantes communes sur rasant du Complexe Ministériel Cuzco, actuel siège du Ministère d'Industrie, Tourisme et Commerce et du Ministère d'Économie et Finances.


lundi, 18 juillet 2011

ONAS, a attribué à l'union temporaire d'entreprises Volconsa/Lopesan/Geaur les travaux d'assainissement d'eaux usées dans des quartiers de la ville de Mbour, Sénégal. Le délai d'exécution sera de 24 mois avec un devis de 7.638.225,57 €.